Transcribed by AI from the city's PDF. Check the original before relying on it.
City of Malden
MASSACHUSETTS
www.cityofmalden.org
Municipal Building Committee:
Malden River Works Salt Shed & Boathouse
Agenda
| September 21, 2026 | 12PM | Virtual Teams Meeting |
|---|---|---|
https://teams.microsoft.com/l/meetupjoin/19%3ameeting_MWIzMTUyZDctN2MyNC00ZjIxLWJlNjAtMGMyNjAxZjk4MDUw%40thread.v2/0?context=%7b%22Tid%22%3a%224a074cd1-7906-46af-b38f-90cd429d7f1b%22%2c%22Oid%22%3a%22651237f4-9307-4b52-8dcf-3f04c3fa328b%22%7d
Chair Nelson Miller called the meeting to order at 12:06PM.
Roll Call
- Deborah Burke - Present
- Peg Crowe - Absent at Roll Call, but arrived later
- Amanda Linehan - Absent
- Nelson Miller - Present
- Paul Myers - Present
- Eric Rubin - Present
- Stephen Winslow - Present
Committee to Approve Minutes
Committee to approve the 9/3/26 meeting minutes.
- Deb motioned to approve the 9/3/26 minutes. Steve seconded the motion, and the Committee voted unanimously to approve the minutes.
Malden River Works Salt Shed & Boathouse Project Updates
Committee to review and approve a proposal (dated 9/14/26 from McPhail Associates, attached) for additional boring prior to bidding in order to facilitate the switch to timber piles.
- The proposal requests approval to do additional subsurface investigation at the proposed structures to further delineate the soil conditions through the full length of the timber piles
- McPhail will perform 2-3 borings to document the subsurface soil and groundwater conditions, 40-60 feet down or to practical refusal, whichever happens first
- Borings will take 2 days to complete, but McPhail needs 6-7 weeks from approval for the report because driller books 3-4 weeks out and then the report will take 2-3 weeks to write
- Lump sum fee for everything is $19,500
- Steve noted that McPhail should start borings at the boathouse, as that is the location where no boring data exists currently
- The group agreed that these additional borings are necessary to ensure that project costs are as low as possible (if timber piles don't work, the alternatives are much more expensive)
- Steve motioned to approve the proposal. Peg seconded the motion, and the motion was unanimously approved via roll call vote.
- Nelson will sign the proposal as chair.
Invoice Approval
N/A
New Business
- The grand opening for Malden River Works "phase 1" is Sunday, October 4 from 1-4PM.
- Eric noted that he participated in the landscaping walkthrough for Phase 1 last week and everything looked good.
Adjournment
Eric motioned to adjourn the meeting. Paul seconded the motion and the motion passed via unanimous vote.
If you would like to request a reasonable accommodation, please contact Maria Luise, ADA Compliance Coordinator at mluise@cityofmalden.org or 781-397-7000 Ext. 2005
For instructions on enabling live translated captions in Teams, please visit: www.cityofmalden.org/captions