What was decided

The committee heard project updates on the Malden River Works Salt Shed & Boathouse, including Phase 1 construction wrapping up in June and Phase 2 funding efforts. The designLAB and Landing Studios team walked through current design plans and answered questions about weather-tightness, security, hardware, geotechnical conditions, and the water fountain. The group reached consensus that a water fountain is needed and that a wooden structure is acceptable as long as windows, doors, and fixtures are strong, hearty, and tamper-resistant.

Decisions recorded

Not checked. This summary is older than the check that matches each decision to the minutes' own words. Summary written by AI from the city's minutes (opens in new tab). Check the original before relying on it. How summaries are checked

Report an error in this summary
Read the full minutes

Transcribed by AI from the city's PDF. Check the original before relying on it.

Municipal Building Committee:

Malden River Works Salt Shed & Boathouse

Agenda

| May 5, 2026 | 11AM | Virtual Teams Meeting |

https://teams.microsoft.com/meet/26476107111150?p=tcy9yoBIOrkfVDsjS3

Roll Call

  • Deborah Burke - Present
  • Peg Crowe - Absent
  • Amanda Linehan - Present
  • Nelson Miller - Present
  • Paul Myers - Present
  • Eric Rubin - Present
  • Stephen Winslow - Present

Malden River Works Salt Shed & Boathouse Project Updates

Sustainability & Grants Manager Rebekah McPheeters provided high level project updates.

  • Phase 1 Construction to wrap in June
  • This meeting is about finalizing the design (and eventually estimate) for Phase 2, Salt Shed & Boathouse construction
  • Phase 2 funding updates
  • OSPCD to submit Section 108 loan application to HUD this week
  • Senator Lewis is working on an earmark for Phase 2 as well
  • We are still expecting to carry over some existing grant funding for Phase 2, and we are still pursuing Bayrd Foundation funding

Design Review of the Salt Shed & Boathouse

designLAB team to walk through their current drawings.

  • The team consists of Sam and Jennea with designLAB, and Ryan and Marie with Landing Studios
  • Sam showed slides with the current plans (attached)
  • Two cost efficiencies found
    • Prefab trusses that will maintain a full wood interior
    • Cladded wood near the ceiling to let light in (Sam noted that the boathouse storage area does not need to be weather-tight)
  • Other recent additions to the plans
    • Added a water bottle filler and fountain
    • Recommending a shower in the coach's office in case anyone falls in the river
    • Garage doors with windows for light
Q+A
  • Deb asked whether the boathouse storage area should indeed be weather-tight, and whether we expect there to be gatherings in the boathouse.
  • Marie noted that based on their research and feedback from the crew team, boathouses aren't a great place to invite the public, they can be dangerous
  • Sam noted that the coach's office, bathrooms, and utilities closet will all be weather-tight/conditioned, but the boat storage area was never intended to be and does not need to be. He noted that having airflow will prevent mold and humidity.
  • Steve noted that sometimes the City's wooden sheds get broken into. Might that be a concern here?
  • Sam noted that the slats will be 10-12 feet in the air, with 4-inch gaps between them, so it would be difficult to break in
  • Steve asked if we are planning to use "marine quality" hardware designed for rust prevention?
  • Sam said yes, everything will be rated for outdoor use and appropriate for the environment.
  • Steve asked about geotechnical considerations, as the area is a filled tide lane/tidal inlet? How stable is the fill?
  • Sam noted that the team includes a geotechnical consultant, and that pilings are anticipated
  • Nelson asked, where is the water fountain?
  • It is planned to be in the interior of the boathouse, exterior of the occupied space (i.e., in the unconditioned space)
  • Based on this, Eric asked that the design draw off the drain for the entire area to be able to winterize the fountain
  • Eric will also send the spec for the City's preferred vandal proof water fountains
  • There was some discussion about whether or not the water fountain is needed, and the consensus was "yes"
  • Sam asked if everyone is comfortable with a wooden structure?
  • Yes, as long as windows/doors/fixtures are strong/hearty/tamper-resistant
  • Sam noted that the team should have cost estimation results by the next meeting

Next Steps

The next virtual Teams meeting is scheduled for June 4 at 12PM.

Adjournment

The meeting adjourned at 11:38AM.

If you would like to request a reasonable accommodation, please contact Maria Luise, ADA Compliance Coordinator at mluise@cityofmalden.org or 781-397-7000 Ext. 2005

For instructions on enabling live translated captions in Teams, please visit: www.cityofmalden.org/captions

Minutes posted on the city website (PDF, 94 KB). Saved copy (opens in new tab), saved .

Agenda

A copy of the agenda wasn't saved here. It is on the city website (opens in new tab).

Terms used here

OSPCD
Office of Strategic Planning and Community Development, the city office for planning, housing, community and economic development, and grants.
ADA
Americans with Disabilities Act, the federal law on access for people with disabilities.

All the terms in the glossary

Source

This meeting's agenda in the City of Malden's Agenda Center (opens in new tab). First recorded by Malden Publick on .